Testimonials

//Testimonials
3008, 2016

Network Rail

Neasden, North London project

“I am very happy with the quality of the installation produced by Aperture on the Network Rail, Neasden, North London project.”

Mark Snowden and Geoff White, KN Network Services

2908, 2016

Advanced Learning Centre, Shafton Barnsley

Laing O’Rourke Construction North

“Apertures SP provided a bespoke weatherproofing solution to 15 service  risers carrying ductwork and cabling to roof level.Despite encountering some very complicated service configurations and working with very restricted space, Apertures rose to the challenge and were able to weather each riser using their specialised weathering system.

Their system is ideally suited to bespoke configurations where every riser is dramatically different. They can cut and form the sections on site, therefore removing the need to measure and fabricate off-site with the costs, lead-times and risk of errors that this entails.

Well done to the team for completing an excellent job in challenging working conditions, I would have no hesitation in working with them again!”

Ben Giles, Section Manager
Laing O’Rourke Construction North

2808, 2016

DW Fitness – Wrexham

DW Fitness – Wrexham

“I would like to thank you for your service on the above project, the guys you sent were excellent and I trust the job went satisfactorily for you. I hope to do business again soon.”

James
Broseley Building Services

2708, 2016

Network Rail

Neasden, North London project

“I am very happy with the quality of the installation produced by Aperture on the Network Rail, Neasden, North London project.”

Mark Snowden and Geoff White
KN Network Services

2508, 2016

Miller House

Miller House – Main Entrance

“Thank you for the work your guys did at the Main Entrance to our office in Edinburgh. The end result is a neat and effective repair to a high profile area.”

John F Stenton
Technical Services Director
Miller Construction (UK) Ltd

Load More Posts